Brasilien / Tunnel boring works start on metro line 6 in São Paulo

On 16th December 2021, the first tunnel boring machine (TBM) started tunnel boring works on metro line 6 in São Paulo. The 2000 t, 109 m long TBM has a ...

Login here with your SCI RAILDATA Username and Password:

Stay logged in

...or get a free trial account here: